Skip to main content
medium disasterVERIFIED◈ 5 SOURCES

Update Kebakaran Pabrik Permen Cikande, Tim DVI Terima 24 Kantong Jenazah, 33 Keluarga Lapor Posko

Verified: 11 outlets have reported this story since Nov 21.

🕐 15h ago·11 outlets

How sure are we

✓ Verified · 11 outlets

Two or more outlets reported this story and its reliability score reached 65%, so WorldPulse marks it verified. That means more than one outlet says so, not that it is proven true.

How we count · Check a link someone shared

Who reported it

The story so far · 65 reports · ✓ Verified Nov 21, 4:59 PM UTC
  1. Nov 21, 4:33 PM UTCFirst report
    Kebakaran Pabrik Permen di Cikande Serang, 42 Karyawan Hilang Kontakcnnindonesia.com ↗
  2. Nov 21, 4:59 PM UTC+26 min
    Pabrik di Cikande Serang Terbakar, Karyawan Diduga Terjebakmerdeka.com ↗
  3. Verified: a second independent outlet reported itNov 21, 4:59 PM UTC · +26 min
  4. Nov 21, 6:11 PM UTC+2 h
    BPBD Serang Sebut Ada Korban Terjebak Kebakaran Pabrik Permen Cikandecnnindonesia.com (again) ↗
  5. Nov 23, 5:59 AM UTC+37 h
    Kebakaran Pabrik Permen di Cikande, Kapolda Banten: 24 Kantong Jenazah Dievakuasijpnn.com (again) ↗
  6. Nov 23, 8:07 AM UTC+40 h
    Said Iqbal Minta Polisi Usut Dugaan Pelanggaran K3 di Kebakaran Pabrik Cikande Serangsuara.com ↗
  7. Nov 23, 8:07 AM UTC+40 h· you’re reading this
    Update Kebakaran Pabrik Permen Cikande, Tim DVI Terima 24 Kantong Jenazah, 33 Keluarga Lapor Poskosuara.com (again) ↗
  8. Nov 23, 8:47 PM UTC+2 d
    Tim SAR Sudah Evakuasi 26 Kantong Jenazah dari Kebakaran Pabrik Permen, Pencarian Berlanjutlampost.co (again) ↗
Verification Log1
cross checkwarning60%

[Claude] The outlets differ: Report 2 gives 7 body bags, conflicting with Report 1's 24 for the same fire, while Reports 3 and 4 match Report 1's 24 and are the same event.

15h ago
Powered by WorldPulse Verification Engine
Discussion (0)

Sign in to join the discussion

No discussion yet — be the first to add context.

Reliability
93%

Very high · How we score this

Risk Score
medium risk