Skip to main content
low economyVERIFIED📡 SPREADING

Celec reactiva la construcción de la hidroeléctrica San Antonio en Cañar con una inversión de 19,31 millones de dólares

Verified: 3 outlets have reported this story since Nov 19.

📍 San Antonio, US·🕐 2h ago·3 outlets

CELEC publicó la contratación para reactivar la hidroeléctrica San Antonio, en Azogues. La obra cuesta 19,31 millones de dólares y prevé operar en abril de 2029

How sure are we

✓ Verified · 3 outlets

Two or more outlets reported this story and its reliability score reached 65%, so WorldPulse marks it verified. That means more than one outlet says so, not that it is proven true.

How we count · Check a link someone shared

Who reported it

Location
Verification Log1
cross checkwarning60%

[Claude] The outlets differ: Report 2 covers the same reactivation with added background on the 2018 halt; Report 3 says the contract will be awarded at the end of 2026, while Report 1 says the contracting was already published a

2h ago
Powered by WorldPulse Verification Engine
Discussion (0)

Sign in to join the discussion

No discussion yet — be the first to add context.

Reliability
92%

Very high · How we score this

Risk Score
low risk